For high in situ stress occurred in Ertan dam area, combined action of initial in situ stress field, time and space effect during excavation and external loads arch thrust etc.
笔者针对二滩电站坝区存在的高地应力现象,从初始地应力场的建立、施工开挖的时空效应,直到与拱推力等外荷载共同作用下对坝基岩体稳定的影响全过程进行了分析和计算。
The horizontal construction joint treatment of Ertan Arch dam concrete, concrete placement of dam base and connection efficiency examination between concrete joints and concrete with dam base.
介绍了二滩拱坝混凝土水平施工缝处理及坝基面混凝土浇筑和检查混凝土缝间、混凝土与坝基结合的效果。
Ertan arch dam is the typical module of high hyperbolic arch dam, whose design method and technique has been widely used in the construction of large-scale hydraulic power plants recently.
二滩拱坝是双曲高拱坝的典型代表,近年来其设计理念、方法被广泛用于国内大型水电枢纽的建设。