The Instructions only instructs the performance, installation, commissioning and operation of CPM-1000 multi-function fluidized bed, a piece of typical equipment.
本说明书只对CPM - 1000多功能流化床机常规设备的性能、安装、调试、操作加以说明。
Ensure equipment installation and maintenance for the plant normal operation.
确保正常计划实施的团队建设和管理掌控。
Design, develop and co-ordinate the installation, maintenance and operation of subsea well-head and production equipment.
设计,开发和统筹海底井口和生产设备的安装,维修和操作环节。
应用推荐