We will in accordance with the requirements of ASTM 1527-97 standard and China environmental protection laws and regulations, carry out on-site assessment of environmental issue.
我们会按照美国ASTM 1527 - 97标准和中国环保法律法规要求,开展一期环境现场评估。
Site has been selected to enter the preparation stage of environmental impact assessment.
现已选定厂址,进入环境影响评价准备工作阶段。
A disposal site should be located at an area near the place where the wastes are produced. The site investigation and assessment system should focus on aspects of environmental hydrogeology.
处置场的选址应遵循就近原则, 并应从环境水文地质的角度来构建场地的选址及评价体系;
应用推荐