Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.
不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。
Design management is important to construction project management on the ground of life-cycle of project Theory and the datum of quality accidents of construction engineering.
根据项目全生命周期理论和对建筑工程质量事故的调查数据,设计管理对建设项目管理尤为重要。
This makes the using of form drawing datum by next process easier and could meet the data exchanging in the concurrent engineering.
方便了后续过程对表格图形数据的引用,可以满足并行工程中的数据交换。
应用推荐