The main methods of project post evaluation include: logical framework approach, with and without comparison, analytical hierarchy process, cause and effect analysis and comprehensive evaluation.
项目后评价的主要方法有:逻辑框架法、有无对比法、层次分析法、因果分析法和综合评价法等。
Figure 14 shows a comparison of the netserver scalability tests when using 2 adapters (1 on each of the first 2 nodes) and 4 adapters (1 on each of all 4 nodes) with and without bonding.
图14对比了在启用和禁用绑定的情况下netserver可伸缩性测试的结果,测试使用2个适配器(前2个节点上各使用一个适配器)和4个适配器(所有4个节点上各使用一个适配器)。
Table 6 shows the full comparison of all key resource metrics on a Lotus Domino 8.5 server with and without DAOS enabled.
表6展示了启用和未启用DAOS的Lotus Domino 8.5服务器上的所有关键资源指标的完整对比。
应用推荐