Wind power farm civil construction consists of generator foundation and wind turbine transformer foundation constructions.
风电场的土建施工主要包括发电机的设备基础和风机变压器基础施工。
On this basis, adopting parallel connection of generator sets a precise wind farm model is constructed and reactive power distribution scheme of this wind farm is given.
在此基础上,采用发电机并联的方式,构建了精确的风电场模型,并给出了风电场的无功功率分配方案。
And then wind speed, wind generators and wind farm are modeled. Wind generator model includes wind turbine model, transferring structure model and asynchronous generator model.
其次建立了风速、风电机组及发电机组数学模型,其中风电机组的数学模型主要包括风轮机模型、传动机构模型和异步发电机模型。
应用推荐