... 机高Machine height 平面宽Width of platform 运输状态斗杆外缘到回转速机距离 Distance from the arm to rotate machine ...
基于4个网页-相关网页
The results showed that the width of the staircase from the platform to the station hall would be the bottleneck in the evacuation procedure and the solutions were presented for this case.
研究与计算结果表明 :该地铁站火灾时 ,站台至站厅的楼梯是整个疏散过程的瓶颈 ,而楼梯的疏散能力主要受人员流量和楼梯的 有效 宽度所制约 ,据此提出了相应的解决方法。
The author also gives reasonable design data for the width of baggage and mail tunnel, basic platform and intermediate platform.
对行包和邮政地道、基本站台、中间站台宽度都提出了合理的设计数据。
应用推荐