UJSSP have uncertain processing times and due date windows.
UJSSP具有不确定加工时间和交货期窗口。
To deal with this problem, a proactive scheduling algorithm with uncertain processing times was proposed herein.
针对这一实际问题,提出了一种考虑任务工时不确定性的前摄性车间调度算法。
This paper mainly research on FSSP with uncertain processing times, considering both uncertainty and reducing the affect of the disturbance as much as possible.
由于各种原因,在实际生产过程中存在很多不确定性,本文所研究的是一种加工时间不确定的FSSP。