Therefore the impact of increased steady state and transient voltage stresses on the design of the main equipment for UHVDC stations has to be careful.
因此,必须深入研究提高的稳态和暂态电压应力对特高压直流换流站主设备设计产生的影响。
The UHVDC converter substation is quite different from traditional ones, so it's necessary for carrying out specific research of main electrical scheme and equipment parameters.
电气主接线是指发电厂、变电站、换流站中,为满足预定的功率传送和运行要求而设计的、表明高压电气设备之间相互连接关系的传送能量的电路。
应用推荐