Type curve match analysis is the main method of modern well test interpretation, but the error of this method is unavoidable because of the limitation of the type curves in a sample plot.
图版拟合是现代试井分析的主要方法,由于图版上典型曲线分辨率的限制,使得典型曲线图版拟合分析不可避免地存在误差。
Examples of superposition analysis method for changing production rate test are given in the paper. The results are compared with the results getting from Horner method and type curve matching method.
文中给出了变产量叠加方法应用的示例,并与霍纳方法及典型曲线拟合方法进行了对比分析。
应用推荐