This paper introduces a new method that estimates the through error of a curve tunnel.
本文介绍一种曲线隧道贯通误差预计的新方法。
The design and implementation of control, survey and adjustment scheme of holing through error in Danjiashao Tunnel construction are presented in this paper.
介绍旦架哨隧道施工中贯通误差的控制、测量、调整方案的设计与实施过程。
The through error of tunnel is estimated, some suggestions are given for traverse surveying inside tunnel.
同时对隧洞贯通误差进行了估计,对洞内导线测量提出了建议。
应用推荐