Around 300 trains should be able to speed through the Gotthard's twin tubes every day, at up to 250 kilometers per hour (155 mph) for passenger trains, according to planners.
根据设计者的设计,将允许有每天大约300辆火车穿梭在圣哥达的双管隧道中,最高设计时速达250Km/h(155mph)。
Around 50 passenger trains and up to 260 freight trains will travel through the tunnel every day, cutting the journey time between Zurich and Milan by around 40 minutes.
每天预计会有约50列客运火车、最多260列货运火车通过隧道,隧道的运行将从苏黎世到米兰的旅途缩短了约40分钟。
应用推荐