For the RCC dam of Taolinkou Reservoir, RCC was developed in the conventional concrete.
桃林口水库碾压混凝土坝为“金包银”形式。
The RCC dam of Longtan project is one of the highest dam in the world under construction.
龙滩水电站大坝为目前世界上在建的最高碾压混凝土坝。
Based on the analysis of the seepage reasons of the roller compacted concrete, a design idea against seepage of the RCC dam is developed in this article, in which anti seepage is the stress.
在碾压混凝土渗透成因分析的基础上,本文提出以防为主,防排结合的碾压混凝土坝体渗控设计概念。
应用推荐