Gaining feedback from both the production-line workers and the component suppliers is a long and awkward process.
要从生产线工人和零件供应商那获得反馈是又长又尴尬的过程。
The drawbacks of conventional pretreatment process for cotton are long process line, large scouring loss and large mass consumption.
传统的纯棉绞纱前处理工艺存在工艺流程长、煮损率大、物料消耗大等缺点。
Taking a long-span transmission tower as example, finite element method was employed to construct a tower-line model and simulate the conduct dropping process.
以某大跨越输电塔为例,采用有限元方法建立了塔线模型,并对导线的跌落过程进行模拟。
应用推荐