The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis.
通常建议对大坝进行特定场地的地震危险性分析。
According to the earthquake hazard analysis on the site, the ground motion parameters are received and the rock time generated seismic wave of the site is composed.
通过对该桥桥址处的地震危险性分析,得出了桥位处的地震动参数,并合成了桥址处基岩人工波时程和场地土人工波时。
The results of this study also show that estimation of seismic stress drop from the peak parameters of ground motion will become a new practical method.
研究结果还表明用地面运动峰值参数估算地震应力降是一种新的实用性较强的方法。
应用推荐