... T The Ballad of Pistol Pete 微金属 The Blast in Line 强力金属 The Buzzer Beater 传统金属 ...
基于1个网页-相关网页
John Berman fills in the time line leading up to the blast and immediately afterwards.
约翰·伯曼冲过终点线导致随后的爆炸。
In general, as the distance between double line tunnel and existing tunnel is very small, excavating blast in double line tunnel will affect structure safety of existing tunnel.
复线隧道与既有隧道的净间距一般都较小,因此,施工爆破对既有隧道会有较大的影响。
This paper describes a computer visual technique for on-line measurement of the height of foaming slag in blast furnace which simulation experiment has been done in laboratory.
给出一种基于计算机视觉技术的高炉熔渣泡沫高度在线检测方法。
应用推荐