Performance management designs on raises the evaluation indicator structure of technical personnel.
绩效考核旨在提出考评技术人员的指标结构;
The technical efficiency as a whole can he improved to some degree through such measures as optimizing investment scale and structure and personnel training.
通过优化投入规模与结构、人员培训等措施能够在一定程度上提高我国森林公园整体的技术效率。
This paper provides a method for reinforced concrete shear wall structure optimization design under horizontal earthquake, and for engineering and technical personnel some degree of reference value.
本文为水平地震作用下钢筋混凝土剪力墙结构的优化设计提供了一种方法,对工程技术人员亦有一定的参考价值。
应用推荐