A study by the Rand Corporation found that "a doubling in the number of [nuclear] reactors [built by an architect-engineer] results in a 5% reduction in both construction time and capital cost".
兰德公司(Rand Corporation)的研究发现,“(建筑工程师)制造的(核)反应堆数量增加一倍,所需的制造时间和资金成本下降5%。”
The feasibility study is the important content in the period of the earlier constructing time, and is the constituent of the capital construction procedure.
可行性研究是建设前期工作的重要内容,是基本建设程序中的重要组成部分。
Objective For provide basis of construction base of GAP, to study the best harvesting time of Anhui Fengdan Peony.
目的研究安徽南陵凤丹皮最佳采收期,为牡丹皮gap基地建设提供依据。