The behavior of pile raft foundation in soft soil is a very important problem in geotechnical engineering.
软弱地基中桩筏基础的研究一直是岩土工程中的一个重要课题,也是土木工程设计的一项关键技术。
The theories of interaction are summarized and analytical models of raft, pile-soil and superstructure are settled respectively.
分析了大量现有的共同作用理论,分别整理了上部结构、筏板与桩土的分析模式。
Considering the thick backfill and soft foundation soil in the cut-and-cover section of Jiadi tunnel, a pile-raft foundation is accepted in order to avoid negative effect due to excessive settlement.
浃底隧道出口明洞段回填厚度较大而基础土体软弱,因此采用了桩-筏基础的形式以避免过大沉降带来的不利影响。
应用推荐