Site soil conditions are very poor, the pit is next to road, pipelines and structures, the surrounding environment is complex.
场地土质条件很差,基坑紧邻道路、市政管线和建筑物,周边环境复杂。
Some practical charts and simple formulas for figuring the amount of shear walls with different seismic intensity and site soil conditions are also given.
进而提出了在不同设防烈度及场地土条件下确定剪力墙数量的实用图表及简单公式。
Have your building contractor and landscaper work together during the design and building process, communicating about slope issues, drainage, site and soil conditions.
有在设计和建设过程中的景物建筑承建商和一起工作,有关斜坡的问题,渠务,地盘和土壤条件下进行沟通。
应用推荐