Under the premise of resolving two above-mentinged problems, it can shorten the work period, lower the engineering cost, obtain the best processing effect.
3、在解决上述两个问题的前提下,还要能够缩短工期,降低工程成本,达到最佳的处理效果。
参考来源 - 真空联合堆载预压法加固机理及工程应用·2,447,543篇论文数据,部分数据来源于NoteExpress
This software can provide a convenient man-machine conversation and shorten greatly the period of generator design, therefore improving work efficiency.
该软件实现人机交流十分方便,缩短了电机设计周期,提高了工作效率。
Using the mixed binder can shorten the shell making period, improve the quality of the investment casting, improve the work condition, and reduce the circumstance pollution and production cost.
混合粘结剂的的应用,缩短了制壳生产周期,提高了精铸件的质量,改善了劳动条件,减少了环境污染,大幅度降低了生产成本。
应用推荐