go top

risk of construction period

网络释义

  施工期风险

施工期风险

基于1个网页-相关网页

有道翻译

risk of construction period

工期风险

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • The method of Analytic Hierarchy Process is used to identify the risk events of flood. The probability of flood is determined by construction period and flood control standard.

    洪水风险事件识别采用层次分析法进行,并结合施工工期防洪标准来确定洪水发生概率

    youdao

  • The average risk of structure in construction period is far higher than one in use period. To make the risk analysis study is very necessary in the construction of large-span cable-stayed bridge.

    结构施工期平均风险远远高于使用期,开展大跨度斜拉桥施工期间风险分析研究十分必要的。

    youdao

  • The invention has the beneficial effects of low construction risk, high efficiency, short construction period, high installation accuracy and low installation cost.

    发明有益效果是:施工危险效率高工期短、安装精度高、安装成本低。

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定