In this paper, the electrical boiler and thermal storage heating system using high temperature water at Beijing Architecture Quality Supervision Station is summarized.
本文总结了北京市建筑质量监督总站电锅炉高温水蓄热系统。
Three controls are the objective of engineering supervision for Gongboxia hydropower station, of which the quality control is the core work in the engineering supervision.
公伯峡水电站机电安装的监理工作目标是进行三大控制,其中质量控制是监理的核心工作。
CAM is also approved establishing the Heilongjiang Station of Quality Supervision and Inspection for Machinery Products.
中心还被批准设立黑龙江省机械产品质量监督检验站。
应用推荐