Click this link (also accessible from the project Settings file) and enter in the application ID (in this case gaejarticleforrick), as show in Figure 11.
单击此链接(也可以从项目设置文件访问)并输入应用程序ID(在本例中为gaejarticleforrick),如图11所示。
Results of case studies show that the proposed LCC model can be used to optimize the project schemes and improve the investment efficiency, and it is correct and practical.
通过实例进行的电力设备LCC计算分析,真实地反映了工程中现金流水平,证实了模型的正确性和工程实用性。
With the help of one project case, studies show that the post positional assisted heat source surface water heat pump system is superior in the operation cost and energy saving.
推导出了两种形式下热泵系统单位小时运行费用,结合某实例说明采用后置式辅助热源的地表水源热泵系统运行费用小,具有节能的优越性。
应用推荐