The main requirements for cm operational conceptual hydrologic model are function development, model calibration, and validation followed by production of forecast runs and analysis of results.
功能改进,模型率定,模型预报的验证以及其结果分析是应用概念水文模型所需要的几个主要部分。
Developed a detailed operational process, the required production equipment were selected and provide a reference model, while raw materials were selected and develop the security measures.
对所需生产设备进行了选择,提供了参考型号;同时还进行了生产原料选择、安全防护措施制定、产品的性能指标确定、监测方法选定等工作。
The utility model has reasonable structure, convenient processing, low production cost, strong working reliability, high operational efficiency and good extraction effect.
本实用新型结构合理、易于加工、 生产成本低、工作可靠性强,且工作效率高、萃取效果好。
应用推荐