That didn’t happen at Fukushima Daiichi, a complex with a number of reactors: backups to backups to the pumps’ power supplies failed.
这种情况并未在福岛的核电站发生,这是一个复杂的数量众多的反应堆:水循环的动力供应失效了。
As complex power method introduces large number new nodes, the invert of tracing matrixes will consume a long time.
由于复功率追踪引入了与线路数目相等的新节点,对潮流跟踪矩阵进行求逆时将耗费大量的时间。
应用推荐