The high power handling (3000 watts plus) relays in the WPR-26 allow simple set up and operation without the complex routing of signal cables.
高功率处理能力(300 0瓦特加)在太区继电器- 26允许简单的设置和没有信号电缆复杂的路由操作。
The system shall be installed and constructed in compliance with relevant IEC or China national standards or specifications. Power, control, and signal cables shall be wired separately.
系统安装、施工应符合相应的IEC国际标准或中国国家标准规范。所有的动力电缆、控制电缆和信号电缆布线要分开。
Several factors contributes to the damages on control equipment such as the bad grounding of power supply and signal cables, virtual earth and utilizing installing bracket as grounding etc.
引起热控设备损坏的原因有电源及信号电缆接地不良、虚接地及利用安装支架作为接地等情况。
应用推荐