By the experimental result, we clarify every factor under utility model impact on optimum planning solution and DPG algorithm complexity.
通过实验结果,我们阐明了效用模型下,各因素对最优规划解及DPG算法复杂度的影响。
The corresponding mathematical model and DPSO solution algorithm for transmission network expansion planning are developed through the construction of extended node matrix and velocity matrix.
通过构造节点扩展矩阵和速度矩阵,建立了输电网络扩展规划问题的求解模型和DPSO求解算法。
For supply chain that mainly depend on core enterprises, this paper presents a three-layer production planning control model, and the algorithm with examples for the production planning.
针对以核心企业为主的供应链,提出了三层生产计划控制模型并给出了其节点企业内部生产计划的具体算法与运行实例。
应用推荐