... Bearing Base Life 轴承基本寿命 piles composite bearing base 夯扩载体桩 composite bearing base 复合载体 ...
基于12个网页-相关网页
By analyzing the problems existed in the process of measurement he deep mixing pile and the ram compaction piles with composite bearing base, measures are put forward.
通过对深层搅拌桩和复合载体夯扩桩施工过程可能出现的问题分析,提出了可行的预防措施。
For the ram compaction piles with composite bearing base, the speed of drawing pipe must be controlled, so as to avoid the gapping or the cut-off.
在复合载体夯扩桩的施工过程中,一定要控制好拔管速度,以免出现缩颈或断桩现象。
应用推荐