Stability forecast model for high steep rocky slope was studied by Linear and nonlinear methods with the case of east open-pit high steep slope in Daye Iron Mine.
结合大冶铁矿东露天高陡边坡,运用线性和非线性方法研究了岩质高陡边坡的稳定性预测模型。
It is the first international case of applying diaphragm wall in open-pit mine, and therefore, is of the value of wide spreading.
地下连续墙在露天矿中的应用在国际上还是首例,具有广泛的推广和应用价值。
应用推荐