The project crate is not intended to contain information already maintained in the configuration management (CM) and control system.
项目栅格中不包含已经在配置管理(配置管理,CM)中维护的信息,并控制系统。
The organization shall establish, implement and maintain a procedure to create, update and control the documented information associated with the environmental management system.
组织应建立,实施和保持程序以便产生,更新和控制与环境管理体系相关联的文件化的信息。
Based on the system partition of the large area of production control and the area of management information, the system partition framework of the nuclear power plant is established.
以电力监控系统安全防护要求所建立的生产控制大区与管理信息大区的系统分区,较成体系地构建了核电厂的系统分区框架。
应用推荐