The last step of the setup procedure is to test the failover capability of HADR. Follow these steps.
设置过程的最后一步是测试HADR的故障恢复功能。
The last step is to take a moment and be sure that our tests really do test all aspects of the behavior or feature we are implementing.
最后一步是花一些时间并确保我们的测试真正测试了我们要实现的方法或特性的所有方面。
It includes all unmarked test steps since the last step that was marked as passed or failed.
它会包含最后一个标记为成功或失败之步骤以后的所有未标记测试步骤。
应用推荐