The integration of control system lays the foundation for quadruped robot remote control.
控制系统的集成化为足式机器人的离线控制奠定了基础。
The idea of this paper is from the project of HuangNeng NanTong Power Plant, which mainly deals with the integration of control system for fuel dock and MIS construction.
论文背景来源于企业委任项目——华能南通电厂燃运公司输煤控制系统与计算机信息管理系统的整合。
The company is now prepared to complete the design, assembly and integration of the beam control system, leading up to a test in 2010.
目前,该公司正在准备完成设计、对光束控制系统进行集成,并最终于2010年进行测试。
应用推荐