A monolithic model of the lot-sizing and scheduling problem based on the JIT strategy has been proposed in this paper, and a heuristic algorithm using integrated method has been designed to solve it.
文章针对基于JIT思想建立的一种批量计划和作业排序集成问题,建立整体模型,设计了一种启发式算法采用集成方法求求解。
Because the time is included into the modeling method in this paper, the scheduling and controlling problems in FMS can be integrated into this model.
由于时间的因素被考虑到建模方法中,因此FMS的调度和控制问题可以被集成到这个模型中。
This method offers a new effective approach to implement CAPP integrated with production planning and scheduling.
这种方法为CAPP与生产计划调度的一体化集成提供了一种新的途径。
应用推荐