...时间表 (unrealistic schedule) ── 如果在很短的时间里要求做许多事,出现错误是不可避免的。 测试不充分 (inadequate testing)── 只能根据客户意见或者系统崩溃来判断系统质量的高低。
基于16个网页-相关网页
Soil mechanic with probability analysis has not been applied in reservoir bank erosion because of inadequate testing data for soil.
目前土力学方法预测水库塌岸时还没应用可靠度计算,因为一般预测工作中没有足够的岩土测试结果;
Inadequate load or stress testing.
不充足的负载或压力测试。
Samples from the girl are inadequate for testing, and the cause of her death will probably never be known with certainty.
采自该女孩的样本不足以进行检测,因而可能永远不能确切了解其死亡原因。
应用推荐