Support the optimization of manufacturing process to meet Uptime, First Time Quality, Changeover goals and any other continuous improvement activities.
支持生产过程的最优化,以达到设备正常运行时间,首次合格率,换型目标和其他持续改进。
Therefore, the accurate measurement of the labyrinth gap of aeroengine is very necessary and required in the process of research, improvement, maintenance and manufacturing.
因此,准确测量发动机的篦齿间隙在航空发动机研发、改进、制造以及维护的过程中是十分必要也是必需的。
This paper analyzes the unreasonable matters existed in the gas manufacturing process of water gas generator and presents a proposal of improvement measures for gas manufacturing.
分析了水煤气发生炉造气工艺存在的不合理之处,提出了造气工艺的改进措施。
应用推荐