This specification is applied to the construction and acceptance work for heat power engineering automation project in power plant.
该规范适用于大量发电厂热工自动化工程的施工及验收工作。
To meet the demands of heat engineering automation control in power plants, a new distributed control system based on field bus is developed by adopting the latest software and hardware techniques.
采用最新的软、硬件技术,充分考虑火电厂热工自动控制应用的需要,开发了基于现场总线的新一代分散控制系统。
应用推荐