The arch bridge geometry and internal force will deviate from the status of primary bridge after the bridge served a few years.
对于运营多年的拱桥,其线形和内力会偏离原来的设计线形与内力。
The erection elevations of formwork for segment concrete were given by comprehensive analysis to ensure that the geometry and the internal force state meet the design requirements.
同时,针对该桥施工进行应力、线形和温度监控,综合分析给出节段立模标高,确保了成桥线形和内力状态满足设计要求。
应用推荐