The engineering design, geology design, main technique difficulty, operation general situation, well track measurement and control technique of the well are introduced.
介绍了该井工程设计、地质设计、主要技术难点、施工概况、井眼轨迹测量及控制技术等。
According to actual engineering, engineering general situation and main technique standards of track transportation in No. 1 line of Wuhan City is developed.
从工程实际出发,介绍了武汉市轨道交通一号线一期工程轨道工程的工程概况及主要技术标准。
应用推荐