The production of gas turbine is concerned with plenty of new material, new structure and new advanced technology as well as with no load test and performance test technology of gas turbine.
燃气轮机的生产制造涉及大量新材料、新结构、新制造技术,涉及燃气轮机的空负荷试车及性能测试技术。
The minimal amount of fluid carrying of gas well bore model and the continuous flow condition is acquired to limit minimal test production.
⑷采用最小携液量和低速非达西流连续流动条件限定最小测试流量;
应用推荐