Before work begins, an erection manual (see Secton 9.1), which if necessary takes account of the special circumstances of the site, shall be submitted.
开工前,必须提交架设手册(见第9.1章节),手册必须考虑风场的特殊环境条件。
Equipment acceptance and delivery to site, site erection support and turn-over.
设备验收和交货至现场,现场安装支持和移交。
It was built entirely from a metal skeleton (lightweight construction), most of which was built in the factory and transported to the site for erection and finishing touches.
建筑仅用三个月就建造完成,其中绝大部分是在工厂浇筑现场安装完成的。
应用推荐