This paper analyzed the key factors that affect the power consumption in power distribution system of coal preparation plant, and presents some effective energy saving measures.
分析了选煤厂供配电系统中影响功率消耗的主要因素,并介绍了一些行之有效的节能措施。
The steady wear matrix is applied to the loading ball system and the adding ball system of ball mills in 200 MW power plant, metal consumption and electrical energy consumption are reduced.
把该钢球稳态磨损矩阵应用于某电厂200 MW机组钢球磨煤机的装补球制度,降低了钢球磨煤机的钢耗和电耗。
BBD Ball mill is a widely used milling device in power plant system. It has the advantages of low energy consumption, high efficiency, widely range of grinding coal, and so on.
双进双出磨煤机是在电厂系统中广泛应用的一种制粉设备,它具有能耗低、生产效率高、研磨煤种范围广等优点。
应用推荐