At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.
目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。
As compared with common power materials, materials for electric power capital construction are characterized by use for a given project, press of time, short duration in storage, etc.
电力基建物资与一般电力物资相比,具有一次专用性强、时间要求快、库存时间短等特点。
This article briefly introduces construction dewatering in the SAN filled area for the Mawan Electric Power Plant project.
本文对深圳妈湾电厂填砂区的施工降水作扼要介绍。
应用推荐