In East Yorkshire the team installed sensors to monitor humidity in the anchorage Chambers of the Humber Bridge, where steel struts must be kept dry.
在英国东约克郡,这支队伍在亨伯桥的锚定室中安装传感器监测湿度,桥中的钢支柱必须保持干燥。
Descending into the hole months later, in December 2009, a scientific team confirmed the new, naturally dry crystal cave about 500 feet (150 meters) below the surface.
数月之后的2009年12月,一个科考队深入了这个洞穴,他们确认这是一个新的自然风干形成的晶体洞穴,位于大约500英尺(150米)的地下。
The team also re-clad a fireplace with dry-stack limestone and overhauled an entry vestibule, replacing solid walls with glass to enable views outward.
团队还用干堆灰石重新装修了壁炉,并检修了入口玄关,用玻璃替代坚实的墙壁,以便能向外看。
应用推荐