Distribution transformer adds power factor correction capacitor in the secondary side to collect compensate, so as to advance power factor and augment the load capacity of transformer.
配电变压器二次侧增设移相电容器进行集中补偿,提高了功率因数,增大了变压器的负载能力。
The load supplying capability (LSC) of urban distribution network is the maximum load which can be supplied by the network without any branch (line and transformer included) exceeding its capacity.
城市电网的最大供电能力是指在城市电网任意支路(线路、变压器)无过负荷条件下所能供应的最大负荷。
The requirements of distribution transformer short impedance in national specifications were analyzed and transformer short-circuit impedance was used to test the capacity of transformer.
文中分析了国家标准中规定的配电变压器短路阻抗的要求,提出了利用变压器短路阻抗来测试变压器实际容量的方法,并研制了相关测试装置。