... The Construction ofthe Site地建设 Delivery of Equipment and Materials交付设备和材料 Delaying Construction延迟建设 ...
基于12个网页-相关网页
Arrange for the maintenance of all necessary equipment and materials relating to the effective delivery and measurement of training.
安排维修一切必要的设备以及与有效执行培训评估相关的材料。
The said prices of the Equipment and Materials and Spare Parts are for delivery FOB hamburg, Rotterdam or Kobe.
上述设备和以及备件的价格,为汉堡、鹿特丹或神户船上交货价格。
The date of bill fo lading shall be considered as the actual delivery date of the Equipment and Materials.
提单日期应视为设备和的实际交货日期。
应用推荐