Typical smart meter designs include periodic transmission of current, phase, and frequency data from the user to the electricity distribution company.
典型的智能度量设计包括来用户端的电流、相位和频率数据向电力调配公司的周期传送。
For new urban distracts, the traditional 4-phase transportation demand forecasting model can not be used, because of the lack of the trip production and distribution phase data.
对于规划新城区,传统的四阶段交通需求预测方法难以使用,因为交通生成和分布预测所必需的条件无法满足。
应用推荐