The feasibility of the method is verified in dam water level monitoring.
对水库水位的监测验证了该方法的可行性。
The second dam raised the lake’s level by 3.5 meters (12 feet), and the third dam raised water levels by 30 meters (100 feet).
第二座大坝将湖面抬高了3.5米,而第三座大坝又让水位上升了30米。
The 156-meter-high Zipingpu Dam began to fill in December 2004, and within 2 years the water level had risen to 120 meters.
高达156米的紫坪铺大坝于2004年12月份开始蓄水,两年内水位已经涨到了120米。
应用推荐