Works in such conditions, local materials spillway dam how to coordinate the size and height of buildings to ensure that safety is a major engineering design experience.
在此类工程条件下,当地材料坝如何协调泄洪建筑物规模与坝高以保证工程安全是本工程设计的主要经验。
Based on the comprehensive considerations about features and geological conditions of the dam engineering of Shigaoshan Reservoir, this paper probes into the design of safety observation of the dam.
根据石膏山水库大坝工程特点以及地质条件进行多方面的综合考虑,探讨了大坝的安全监测设计。
This optimal result was recommended to design institute and the anti-seismic optimal design method of concrete gravity dam, created in this paper, has good practicability in engineering.
该优化结果已推荐给设计单位参考,文中提出的重力坝抗震优化设计方法具有较好的工程实用性。
应用推荐