Cost model for reliability optimization 可靠度最佳化成本模式
Cost driver optimization model 成本动因合并模型
Optimization Model of Cost-Benefit 成本效益优化模型
An optimization model to find the lowest budget schedule of network planning is established under the assumption that the time-cost relationship is nonlinear.
在时间-费用关系为非线性的假设下,建立求网络计划最低成本日程的优化模型。
An optimization model for the redundant multi sensor system and the criteria with a minimum cost which fulfill the systems availability constraint are presented.
从系统有效度和系统代价出发提出了一种多传感器冗余系统的优化模型和满足有效度约束的最小代价准则。
The comprehensive optimization model for system reliability and system cost was set up for a parallel system under given conditions.
针对给定条件的并联系统建立了系统可靠度与系统费用的模糊综合优化模型。
应用推荐